Eden Renovations

Bathroom Refurbishment and Alterations

 A fairly simple bathroom refurbishment project

This was a 3 meters by 3 meters bathroom with bathtub, bidet, toilet and washbasin. The idea was to have in the new bathroom a freestanding bathtub and a cubicle shower as well. The space for the cubicle shower came from an old storage space with access from the hallway. The wall separating the bathroom and the storage space was removed, to allow a well sized shower tray to be installed in that space.

Overall, there was necessary to remove all the pipework used for the previous fixtures and new one laid in place, as well as for the drainage pipework.

We spent 2 weeks on this project and spent £9000 on materials and labour work.